Contact Us Today - 01405 704722

Concrete floor repairs to level access doorway, Avonmouth Industrial Estate, Bristol.

Concrete floor repairs to level access doorway, Avonmouth Industrial Estate,
Bristol.

Level access doorway interfaces between the warehouse and the external
concrete yard are usually one of the busiest locations for logistic
operations and warehouses. This warehouse on the Avonmouth industrial estate
has only one access doorway and so the concrete had begun to breakdown
considerably over a period of 8 years. Their logistics operators Superdrug
and Dulux Paints, operate the warehouse 6 days a week and so the only
opportunity that Nationwide Concrete Flooring from Goole had to repair the
concrete section of floor,was in the Easter shut down period. The damaged
concrete slab was broken out in just one day, utilising the concrete
flooring contractors vast range of equipment and labour resources. The high
strength and quick-setting reinforced Readymix concrete was then laid and
compacted by the concrete flooring staff to create a suitably repaired
concrete slab, fit for the purpose for the next ten years.
If you would like some further details on this concrete floor repair project
in Avonmouth or if you have a requirement for some concrete floor repairs of
your own, then please do not hesitate to contact us on 01405 704722 or
simply e-mail sales@nd-group.com

After

Related Projects